At the gates first day of Road First official day on the
Snowcat working on Lower Quad to move the snow to guardrail level. After that the motor patrol can come in and remove ...
Summary & Highlights for Beartooth Highway Clearing April 9 2014
- Crews check the snow levels and guardrail at the state line.
- Levels of snow on Upper Quad. Drifts are higher this year with some drifts 25-30 feet above guardrail height.
- Randy Roth, MDT Maintenance chief checks out snow levels on the
- V-plow clears snow over the edge just above 2nd switchback.
- Crews work on a large avalanche chute area above 3rd switchback.